IDC Change Orders
Interchange Distrubution Calculator Working Group (IDCWG)  

IDC Change Orders
File Type Size Date CO# Description
Acrobat 683 KB 6/11/99 01 Add Carolina Power and Light (CP&L) as a new Control Area User of IDC, a single geographic site with no more than five (5) users.
Acrobat 1,391 KB 10/25/99 04 IDC Tag Database Output Capability
Acrobat 1,032 KB 9/19/99 06 Transaction TLR MW Level Change Capability
Acrobat 141 KB 9/22/10 08 Linden Variable Frequency Transformer (VFT) Model in IDC
Acrobat 1,032 KB 9/19/99 09 Add IDC User Classification
Acrobat 1,047 KB 5/9/99 10 E-Tag Security
Acrobat 1,053 KB 9/13/99 11 Enron Subscription
Acrobat 1,052 KB 9/14/99 12 IDC Training Course for Virginia Power
Acrobat 1,371 KB 9/4/99 13 TLR 0
Acrobat 1,050 KB 9/24/99 14 TLR MW Rounding
Acrobat 1,066 KB 9/9/99 15 Outage Alarm Capability
Acrobat 1,053 KB 9/8/99 16 Date and Time on IDC Screens for Printouts
Acrobat 1,386 KB 11/6/00 17 Alarm Notification in IDC
Acrobat 1,055 KB 10/27/99 18 Upgrade ENRON IDC subscription to CA-Study User
Acrobat 740 KB 10/27/99 19 Upgrade CP&L IDC subscription to CA-Study User
Acrobat 1,063 KB 1/9/00 21 Matrix Update On Demand
Acrobat 1,031 KB 11/19/99 22 TLR Issue Screen
Acrobat 1,072 KB 1/9/00 23 Awareness of new temporary flowgates to the DFTF
Acrobat 1,049 KB 12/20/99 26 AEP Subscription
Acrobat 140 KB 12/9/00 27 Incorporate E-Tag version 1.5 in the IDC.
Acrobat 1,703 KB 4/26/00 30 MRD summer 2000 implementation
Acrobat 1,068 KB 3/17/00 31 IDC Training Course for NERC Operating Authorities
Acrobat 1,061 KB 3/22/00 32 IDC Training Course for AEP and EMSC
Acrobat!!!! 1,042 KB 7/24/00 34 IDC information to the NERC FTP site
Acrobat !!!! 1,055 KB 6/5/00 36 Separate Training Environment for IDC
Acrobat !!!! 1,042 KB 4/20/00 37 LG&E Subscription
Acrobat  100 KB 10/20/02 38i Phase Shifter Modeling Enhancements
Acrobat  1,393 KB 5/30/00 39 New TLR levels, Reloading and Reallocation in IDC
Acrobat 1,043 KB 5/15/00 40 CINERGY Subscription
Acrobat !!!! 1,037 KB 6/6/00 41 Provide IDC with the capability to support Next Hour Market and E-tag specification 1.6
Acrobat 1,045 KB 6/2/00 42 Curtailment Notification by E-Tag
Acrobat 1,039 KB 5/26/00 44 Dayton Power and Light (DP&L) Subscription
Acrobat 1,049 KB 6/5/00 45 FPL Subscription
Acrobat 1,065 KB 6/20/00 46 SDX Fetching for Intra-hour TDF Matrix Computation
Acrobat 1,063 KB 2/1/01 47 TLR Level 5 Data Capture
Acrobat 1,049 KB 6/29/00 48 Hydro Quebec subscription
Acrobat 1,043 KB 10/6/00 49 Matrix Mismatch Checking and Alarming
Acrobat 1,046 KB 10/6/00 50 Priority Level of Transactions between the Eastern Interconnection and ERCOT or WSCC.
Acrobat 1,048 KB 10/6/00 53 TDF Matrix Mismatch Check with Swing Bus Branch
Acrobat 1,036 KB 7/10/00 54 CPM Method for Eau Claire-Arpin Flowgates
Acrobat 1,052 KB 7/28/00 55 Modification of IDC's user interface for reloaded transactions
Acrobat 1,042 KB 9/18/00 56 Add MISO as View Only IDC User
Acrobat !!!! 1,034 KB 9/5/00 57 In the PJM subscription to IDC, change a SC user type to a CA-View user type.
Acrobat 220 KB 10/6/00 58 Study Mode, Flow-Based
Acrobat 1,384 KB 10/23/00 59 Tag Dump Time Extension
Acrobat 1,025 KB 9/26/00 60 TLR Bucket Rounding
Acrobat 1,082 KB 12/21/00 62 E-Tag Receipt Timing
Acrobat 708 KB 12/14/00 63 Integral Control Area Mapping
Acrobat 46 KB 8/12/01 64d Congestion Management Report, Adjust List, Adjust Tables and Timing
Acrobat 706 KB 1/21/01 66 Automated TLR Log
Acrobat 732 KB 2/2/01 67 Additional IMO SC user
Acrobat 736 KB 2/11/01 68 Control Area Mapping: ATC, Others
Acrobat 1,391 KB 2/12/01 69 WSCC and ERCOT mapping in IDC
Acrobat 3,379 KB 3/19/01 70 NNL Curtailments in IDC
Acrobat 40 KB 9/12/01 71d Congestion Management Report Export
Acrobat 1,337 KB 8/27/04 72 Firm Tag Treatments in IDC
Acrobat 1,064 KB 8/12/01 73 E-Tag 1.67 Implementation in IDC
Acrobat 1,668 KB 5/7/01 75a Late E-Tag Report
Acrobat 127 KB 9/5/03 76a Matrix TDF Consistency Checking
Acrobat 155 KB 5/24/01 77b Implementation of E-Tag 1.7 in IDC
Acrobat 135 KB 8/12/01 78a Memory Upgrade for IDC servers
Acrobat 147 KB 8/12/01 79a American Transmission Company (ATC) Subscription to IDC
Acrobat!!!! 143 KB 8/28/01 80b GLDF Files
Acrobat 62 KB 9/5/01 81a Support CMS Re-Dispatch Initiatives
Acrobat 130 KB 9/7/01 82 Discontinuation of DP&Ls Subscription to IDC
Acrobat 140 KB 10/1/01 83 IDC Training Server Access for Grid South and MISO
Acrobat 154 KB 11/20/01 84a TLR Files Information to FERC
Acrobat 127 KB 11/20/01 86 Separating DECO and CONS Tags in the MECS CA
Acrobat 35 KB 6/25/02 87 Support for Firm Network Integrated Services (7-FN)
Acrobat 12 KB 12/8/01 88 Incorporate Vertical and Horizontal Stacking in the Initial Implementation of E-Tag 1.7.
Acrobat 129 KB 12/10/01 89a Discontinuation of ENRONs Subscription in IDC
Acrobat 135 KB 12/12/01 90b New Security Coordinators users for the MISO Reliability Authority
Acrobat 130 KB 4/01/02 91a Discontinuation of two additional IMO users to the IDC
Acrobat 150 KB 4/20/02 92a Total Incorporation of MECS into MISO Security Coordinator
Acrobat 143 KB 4/20/02 93a MECS Control Area Study Subscription to the IDC
Acrobat 151 KB 5/30/02 96b Splitting of the GRE Control Area in the IDC Model
Acrobat 35 KB 5/7/02 100b Data Connections between IDC and SDX
Acrobat 131KB 4/29/02 101a DENA Control Area View Subscription to the IDC
Acrobat 126 KB 8/22/02 102a Additional User for AEP Control Area View Subscription
Acrobat!!!! 136 KB 9/20/02 103a IDC TLR Data Request for Entergy
Acrobat 145KB 9/23/02 104a IDC On-site Training for PJM
Acrobat !!!! 131 KB 10/20/02 105b WSCC and ERCOT Tag Identification in the TLR Congestion Management Report
Acrobat 168 KB 10/20/02 106a Splitting of the MDU Control Area in the IDC Model
Acrobat 40 KB 10/20/02 107a New WSCC/ERCOT Mapping in the IDC
Acrobat 121 KB 10/20/02 108a Two Additional PJM SC Users in the IDC
Acrobat 32 KB 1/12/03 109a GSFs for Base Case
Acrobat 40 KB 1/15/03 110 Reliability Coordinator Specified Start Time for Curtailments
Acrobat 145 KB 11/11/02 111 IDC On-site Training for PJM West
Acrobat 40KB 1/14/03 112 SDX Peak Load Alarming
Acrobat 79 KB 1/13/03 113b Change Viewable Threshold in IDC NNL (GLDF) Reports
Acrobat 304 KB 9/9/03 114 PJM-MISO Congestion Management Coordination in the IDC
Acrobat 143 KB 2/7/03 116a Additional PJM SC Users in the IDC
Acrobat 142 KB 5/22/03 117a IDC TLR Data Request for XCEL Energy Marketing
Acrobat 113 KB 5/2/03 118b Eliminate Negative LODFs
Acrobat 112 KB 3/26/03 119b Incorporate the NERC SDX Application into the IDC
Acrobat 125 KB 5/2/03 120c Include SDX Application and revised format into the IDC
Acrobat 107 KB 5/25/04 121a Reconfiguration of IDCs NERCnet Firewall
Acrobat 121 KB 5/2/03 122b Insert Flowgate # in E-tag Misc. Field
Acrobat 109 KB 5/4/03 123b Enhance Print Capabilities in the IDC TLR CMR
Acrobat 111 KB 9/14/04 124a IDC TLR data request for DLCO
Acrobat 140 KB 7/31/03 126 MISO IDC TLR Data Request for LGEE
Acrobat 143 KB 9/17/04 128 User Interface for Intra-Hour Transactions
Acrobat 39 KB 6/21/06 129 User Interface for Archival Data Version 4
Acrobat 126 KB 10/19/04 130 Change all Data Streams Using the ftp Protocol to https. 
Change all ODBC Data Transfer to Use https and Web Services. 
Change 10,000 Flowgate Emails Sent to NERC to https and Web Services.
Acrobat 110 KB 10/19/04 135 Addition of a Next Hour Flow Change to the present hours Whole Transaction List (Schedules Impact window)
Acrobat 31 KB 1/23/04 137 IDC TLR data request for IMO
Acrobat 30 KB 12/23/03 138 IDC TLR data request for PJM
Acrobat 187 KB 4/29/03 139 Task Order 81, GSF Viewer Consistency with NERC
Acrobat 147 KB 2/10/04 141 IDC TLR data request for NYISO
Acrobat 153 KB 2/18/04 142 IDC Flowgate Data Request for SPP (Task Order 83)
Acrobat 33 KB 5/3/06 143 Conversion of IDC Data Input Format to PSS/E Version 28 (Rev. 2)
Acrobat 121 KB 3/18/04 144 IDC Change Order 114 Training
Acrobat 134 KB 3/30/04 145 Decommissioning of the AEWC Control Area
Acrobat 139 KB 10/19/04 146 Addition of Control Areas to Mapping for WSC6
Acrobat 142 KB 9/17/04 147 Duke Energy North America TLR Data Request
Acrobat 174 KB 8/10/04 148 Handling of Control Area initiated Reliability Cap Change the IDC so that it properly handles Control Area initiated transaction reliability cap changes made by use of the e-tag curtail feature, thereby preventing improper transaction reloading during TLR events.
Acrobat 141 KB 5/7/04 149 Addition of Users for PJM Control Area View Subscription
Acrobat 141 KB 6/24/04 150 Addition of One User for PJM Control Area View Subscription
Acrobat 142 KB 1/19/05 152 Removal of Outage Entry Screen in the IDC
Acrobat 119 KB 11/10/04 153 Integration of OATIs Problem Reporting and Tracking Tool in IDC
Acrobat 38 KB 3/15/06 154 Firm Redispatch Credit
Acrobat 49 KB 10/19/04 155 Non-Acknowledgement of TLR Alarm
Acrobat 145 KB 9/17/04 156 TLR Market Flow Indicator
Acrobat 141 KB 1/31/05 157 Non-Firm Redispatch Credit
Acrobat 127 KB 9/13/04 159 TVA Outage Data Request
Acrobat 127 KB 10/19/04 160 Transfer of MAIN IDC RC Seats to MISO
Acrobat 40 KB 5/5/05 161 NERC-OATI Data Exchange
Acrobat 139 KB 9/28/04 162 Addition of Users for PJM Control Area View Subscription
Acrobat 111 KB 11/1/04 164 Implementation of Digital Certificates to Access the IDC
Acrobat 38 KB 6/3/05 165 Describe the IDC Handling of Network Islands and Isolated Buses within the IDC and Addition of an Alarm
Acrobat 38 KB 6/8/05 166 Immediate Placement Subsequent Implementation of Client-Side Digital Certificates On Southern Company Owned or Designated IDC Machines
Acrobat 142 KB 11/21/05 167 This Change Order documents the tag actions in IDC when moving from a TLR 5B to a 5A during the same hour.
Acrobat 38 KB 5/3/05 168 Immediate Placement and Subsequent Implementation of Client-Side Digital Certificates on Hydro-Quebec, Trans√Čnergie Owned 0r Designated IDC Machines
Acrobat 141 KB 1/21/05 169 Addition of Users for Midwest ISO Control Area View Subscription
Acrobat 40 KB 6/1/05 170 Factor Updates for Flowgates Created in the IDC
Acrobat 29 KB 6/22/06 171 Graphical Options Available within the IDC
Acrobat 149 KB 1/21/05 173 Immediate Placement and Subsequent Implementation of Client-Side Digital Certificates on Independent Electricity Market Operator (IMO) owned or Designated IDC Machines
Acrobat 45 KB 8/18/05 174 Addition of New Brunswick System Operator as a Reliability Coordinator the IDC
Acrobat 142 KB 12/30/04 175 Addition of Users for PJM Control Area View Subscription
Acrobat 143 KB 02/8/05 177 MISO Market Integration
Acrobat 32 KB 6/28/06 178 TLR Level 3B Second Pass Rev. 1
Acrobat 35 KB 5/27/05 179 FIRM Dynamic Transaction Handling in TLR Levels 14
Acrobat 51 KB 5/5/05 180 Entergy Services Inc. (EES) Subscription to the IDC Addition of one RC User
Acrobat 46 KB 3/28/07 181 Submittal of Factors to NERC Revision 3.2
Acrobat 32 KB 3/13/06 182 Not Send Target Market Flow When Relief Not Needed
Acrobat 51 KB 6/3/05 183 Lake Erie Circulation Study Using IDC Data
Acrobat 38 KB 5/27/05 184 Immediate Placement and Subsequent Implementation of Client-Side Digital Certificates on EES Owned or Designated IDC Machines
Acrobat 33 KB 6/10/05 185 Addition of View Only Subscription for VAP
Acrobat 35 KB 4/27/05 186 Removal of VACAR-North RC Subscription to the IDC
Acrobat 38 KB 5/18/05 187 Immediate Placement and Subsequent Implementation of Client-Side Digital Certificates on New York ISO Owned or Designated IDC Machines
Acrobat 40 KB 7/6/06 188 FG Impact of Phase Angle Regulator Tap Changes
Acrobat 148 KB 1/6/06 189 SPP Market Integration
Acrobat 35 KB 5/25/05 190 Terminate Cinergy Control Area Subscription to the IDC
Acrobat   10/18/05 191 Sub-Priority Visibility in the IDC
Acrobat 35 KB 8/11/05 192 Access to the New SDC FTP Site for OATI
Acrobat 44 KB 2/7/06 193 IDC Service Point Granularity
Acrobat 43 KB 9/6/05 195 New York ISO (NYISO) Subscription to the IDC Addition of One RC User
Acrobat 38 KB 9/14/05 197 Immediate Placement and Subsequent Implementation of Client-Side Digital Certificates for Duke, on behalf of VACAR-South on Duke Power Owned or Designated IDC Machines
Acrobat 38 KB 9/14/05 198 Immediate Placement and Subsequent Implementation of Client-Side Digital Certificates for FPL, on behalf of FRCC on FP&L Owned or Designated IDC Machines
Acrobat 134 KB 1/12/06 199 Holding Intra-Hour Tags
Acrobat 33 KB 3/14/06 200 Start Time of TLR in Issuing Screen
Acrobat 75 KB 3/14/06 201 Tracking of Market Flow and Tag Changes for TLR
Acrobat 103 KB 10/5/05 202 Remove all CA-View users from the IDC contracted by PJM
Acrobat 128 KB 1/12/06 204 Display Whole Transaction List in 15-Minute Intervals
Acrobat 109 KB 2/10/06 206 Addition of View Only Subscription for MAPPCOR
Acrobat 32 KB 4/24/06 207 Implement Option 2 of the Market Flow Sub-Priority Task Force Recommendation
Acrobat 29 KB  4/14/06 208 WSCC Transmission Treatment - Rev 1
Acrobat 28 KB 4/14/06 209 DC Tie Modeling - Rev 1
Acrobat 54 KB 11/8/06 210 Market Flow Alarm
Acrobat 32 KB 3/20/06 211 Addition of Saskatchewan Power Corporation (SPC) as a Reliability Coordinator in the IDC
Acrobat 78 KB 2/22/07 212 Send Additional Data to NERC for Inclusion in the CRC
Acrobat 39 KB 5/3/06 214 IDC User Management - Rev 2
Acrobat 28 KB 6/1/06 215 Addition to Progress Energy as an RC
Acrobat 25 KB 5/30/06 217 Terminate Dominion Control Area Subscription to IDC
Acrobat 26 KB 7/7/06 218 Allocation of Additional Concurrent RC Users
Acrobat 32 KB 8/22/2006 219 Addition of EES ITC as an RC Revision 2.0
Acrobat 694 KB 4/18/08 220 LCA Schedule Summary Rev 3.0
Acrobat 31 KB 9/13/06 221 Terminate EES RC Subscription to the IDC
Acrobat 30 KB 10/11/06 222 Handling of Next Hour Market Flow in TLR-3B
Acrobat 51 KB 11/8/06 223 IDC Curtailment Approval Alarm
Acrobat 49 KB 11/8/06 224 Reload of Firm Tags & Market Flow in TLR 3B & 4
Acrobat 44 KB 1/10/07 225 Market Flow Threshold Modification - Revision 3.0
Acrobat 64 KB 12/14/06 226 Sub-Priority Redispatch Relief Recognition
Acrobat 30 KB 10/11/06 227 EES TLR Study Subscription to IDC
Acrobat 53 KB 11/2/06 228 Excluded Tag Re-Issue User Interface Processing
Acrobat 34 KB 2/22/07 229 Extend Temporary Flow Gates - Rev 2.0
Acrobat 38 KB 12/14/06 230 SDX Download Via Web Service
Acrobat 36 KB 2/28/07 231 NERC Proxy FGTDF Data Request - Rev 1.0
Acrobat 32 KB 2/28/07 232 Flowgate Search Capability in TLR Study and Issuance Pages - Rev. 1.0
Acrobat 43 KB 3/5/07 233 Handling of SPP Physical Transactions Rev1 0
Acrobat 36 KB 4/20/07 234 IDC Modeling of ONT-HQT Transactions
Acrobat 31 KB 5/5/07 235 Exclude Transmission Priorities in HQT
Acrobat 47 KB 7/16/07 236 Data Interface for TLR CMR Report Data - Rev. 3.0
Acrobat 32 KB 6/8/07 237 IDC Training for Saskatchewan Power Company
Acrobat 32 KB 7/2/07 238 SPP  Tag Curtailment Data via webData
Acrobat 47 KB 6/20/07 239 TLR CMR Data Request for Midwest ISO
Acrobat 41 KB 7/5/07 240 Add PJM NYISO DC Line Representation for Neptune DC Tie.pdf
Acrobat 35 KB 7/31/07 241 SPP Remove Marginal Zones
Acrobat 38 KB 8/9/07 242 Market Flow Reliability Cap for TLR3 Rev. 2
Acrobat 52 KB 11/8/07 245 Manitoba and Minnesota PAR Model in IDC
Acrobat 43 KB 1/15/08 246 Mid-Hour Market Flow
Acrobat 51 KB 11/8/07 247 Changes to the Tag Cross Reference Display
Acrobat 52 KB 10/24/07 248 Improvements to Active and Pending TLR Page
Acrobat 56 KB 10/24/07 249 Reconfigure the IDC Front-End Hardware
Acrobat 43 KB 1/15/08 250 PSSE Rev. 30
Acrobat 44 KB 1/18/08 251 Amendment to MAPPCOR View Only Subscription to IDC
Acrobat 45 KB 3/25/08 254 NNL Spreadsheet
Acrobat 44 KB 3/25/08 255 Hide NOT REQUIRED Tags from Congestion Management Report
Acrobat 51 KB 4/14/08 256 IDC to Support 5% Threshold for Market Flows
Acrobat 50 KB 12 /2/08 257 Modification to Tag Cross Reference Display - Rev 1.1
Acrobat 52 KB 4/18/08 258 Flowgate Monitoring - Rev 1
Acrobat 41 KB 4/18/08 259 PJM Request for Flowgate Detail via webData - Rev 1
Acrobat 43 KB 4/29/08 260 IDC Training for TS-MAPPCOR
Acrobat 41 KB 5/1/08 261 Rescind ATC Additional User
Acrobat 84 KB 6/23/08 262 TLR Impact Analysis - Rev 1
Acrobat 49 KB 8/28/08 263 Recognition of Conditional Firm and CBM Firm - Rev 3
Acrobat 105 KB 12/17/08 264 Tag Termination and Cancellation - Rev 1
Acrobat 97 KB 4/23/09 265 Summary of Curtailed E-Tags by Reliability Coordinator and Sub-Ordering of Curtailed ETags within Balancing Authority Areas
Acrobat 45 KB 9/22/08 266 IDC Training for AEP View-Only Users
Acrobat 64 KB 10/7/08 267 MISO Marginal Zone Modification
Acrobat 190 KB 12/17/09 268 Minnesota Power HVDC Representation v 2.0
Acrobat 101 KB 6/22/09 269 Total Schedule MW Column Added - Version 1.2
Acrobat 41 KB 10/10/08 270 Suspension of CO-242 Market Flow Reliability Cap for TLR3
Acrobat 76 KB 12/02/08 271 TLR Source Notification Revision 3.0
Acrobat 41 KB 10/10/08 272 Authorization of OATI Use of IDC Data for DOE Studies
Acrobat 52 KB 8/20/09 273 Hydro Quebec Mapping to EI RC - Version 2.0
Acrobat 43 KB 10/7/0 8 274 Tag Dump Download from IDC
Acrobat 43 KB 10/7/08 275 PJM Market Monitor View Only Subscription to IDC
Acrobat 96 KB 10/17/08 276 NYISO Market Monitor View Only Subscription to IDC
Acrobat 42 KB 12/2/08 277 GLDF Generator Impacts v2.1
Acrobat 47 KB 12/2/08 278 Flowgate Search Feature
Acrobat 148 KB 12/2/08 279 User Configuration Time Zones
Acrobat 98 KB 12/2/08 280 Modification to MW Curtailment Rounding - Rev 1.1
Acrobat 69 KB 12/2/08 281 e-Tag Access by IDC RC Users
Acrobat 50 KB 1/19/09 282 Flowgate 9000 Series
Acrobat 522 KB 11/23/09 283 General to Load Reporting Requirements - Rev3.0
Acrobat 137 KB 4/23/09 284 TLR Market Response Reporting
Acrobat 50 KB 2/4/09  285 Removal of Progress as an RC
Acrobat !!!! 139 KB 5/5/09 286 TAG NSI Info Dump to SPP System v1.2
Acrobat 67 KB 4/23/09 287 Market Flow Hold at Five Percent Threshold v1.1
Acrobat 82 KB 5/5/09 288 Add ONT-TE DC Line Representation for Ontario Quebec DC Tie v1.1
Acrobat 199 KB 5/20/09 289 Changing Neptune DC Line
Acrobat 90 KB 6/22/09 290 Creation of Island Fall Pseudo BA and Tag Mapping Adjustment
Acrobat 83 KB 6/22/09 291 Change for Reload Adjustment for the Markets
Acrobat 145 KB 5/26/09 292 TLR Historical Data for Entergy
Acrobat 132 KB 5/26/09 293 Allocation of Additional Concurrent RC Users
Acrobat 92 KB 6/22/09 294 Automate the SPP Market Suspension Process in IDC
Acrobat 232 KB 12/17/09 295 Split SPP into South and North v2.0
Acrobat 91 KB 6/22/09 297 Improvement to IDC Modeling of Radial or DC Transactions Between Ontario Quebec
Acrobat 159 KB 9/28/09 298 Radial & DC Line Mapping
Acrobat 77 KB 7/22/09 299 Flowgate GSF Display Excel Export
Acrobat 78 KB 9/16/09 300 ERCOT Passive Acknowledgement
Acrobat 204 KB 9/28/09 301 Proper Addition on Columns on CMR
Acrobat 153 KB 9/16/09 302 Linden Variable Frequency Transformer
Acrobat !!!!! 167 KB 9/28/09 303 Corrections to Mappings in CO-297
Acrobat 153 KB 11/23/09 304 WECC Passive Acknowledgement Eval
Acrobat 162 KB 3/1/10 305 NNL Worksheet in Study Mode
Acrobat 153 KB 11/23/09 306 Removal of Reporting & Emailing from CO-225
Acrobat 275 KB 8/2/10 308 Identify Curtailable Tags on Flowgates v3.0
Acrobat !!!!! 173 KB 1/28/10 309 Enhancement to Email Responses
Acrobat 203 KB 2/11/10 310 Tagged Intra-BA Transactions
Acrobat 1,537 KB 2/11/10 311 Generator Outage (GODF) Flowgate
Acrobat 167 KB 5/19/10 312 Addition of Transmission Service Priority Column to Next Hour Transaction List
Acrobat 112 KB 10/7/10 313 Use of SDX Common Names in IDC
Acrobat 181 KB 5/20/10 314 Creation of OMU Pseudo BA and Tag Mapping Adjustment
Acrobat 93 KB 10/15/10  317 Michigan-Ontario PAR Status Change Switch
Acrobat 104 KB 11/29/10 318 GTL Reporting Data Access Restriction in the IDC
Acrobat 118 KB 3/24/11 320 Set Base Loaded Units Scaled PGEN in NNL Calculation to Effective PMAX
Acrobat 175 KB 4/14/11 321 Data Interface for TLR Congestion Management Report Data
Acrobat 168 KB 10/12/11 322 Generation Priority Submission-GTL - Version 2.0
Acrobat 106 KB 3/24/11 323 Request to Access and Use IDC Data
Acrobat 106 KB 4/11/11 323 Request to Access and Use IDC Data  - Version 2.0
Acrobat 141 KB 5/26/11 324 Change in Default TLR Start Time for 3b/5b in IDC TLR Issuance Window
Acrobat 182 KB 5/16/11 325 Changes to TLR Event History Display
Acrobat 146 KB 6/13/11 327 Creation of TAP Pseudo BA for the ALCOA Elements in Tennessee Valley Authority (TVA) (Version 2)
Acrobat 156 KB 7/2/12 328 Intra Hour Tag Curtailment Version 3.0
Acrobat 126 KB 6/22/11 329 Load Adjustment During TLR 5 Issuance
Acrobat 97.8 KB 8/10/11 330 Authorization for OATI Use of IDC Data for DOE Studies (2011)
Acrobat 99 KB 8/18/11 331 IDC Interface to the NAESB webRegistry
Acrobat 194 KB 4/16/12 332 Changes to Manitoba EAR Tag in IDC
Acrobat 114 KB 12/9/11 333 Adding MF and MML Totals to the TLR Event History Display
Acrobat 85 KB 2/21/12 334 Disable the Flowgate Change Email Notifications (Version 2)
Acrobat 101 KB 9/27/11 335 SPP Data Request for the ORS
Acrobat 114 KB 11/28/11 336 Changes to IDC Factor Timing
Acrobat 114 KB 9/29/11 337 Request to Access and Use IDC Data for PJM
Acrobat 69 KB 1/27/12 338 Changing the Default Issue Time to TLR 1 or 0
Acrobat 126 KB 10/25/11 339 MISO Data Request to IDC - Version 2.0
Acrobat 65 KB 1/27/12 340 Effective Date on Market Coordinated Flowgates
Acrobat 77 KB 1/12/12 341 MISO and PJM ED6/7FN Transfer to IDC
Acrobat 59 KB 1/27/12 342 PJM Flowgate Data Request
Acrobat 101 KB 1/27/12 343 Market Flow Data Request from SPP
Acrobat 128 KB 3/8/12 344 Request for Market Flow Data Greater Than 5% from SPPP
Acrobat 90 KB 3/16/12 345 IDC TLR Data Request for NY Transmission Owners
Acrobat 219 KB 4/16/12 346 IDC TLR Auto Acknowledgment - Version 2.0
Acrobat 117 KB 4/16/12 347 IDC TLR Data Request for New York Transmission Owners - April 2012
Acrobat 203 KB 5/9/12 348 MISO Request to Change WebData Interface Version 1.0
Acrobat 115 KB 7/2/12 349 TLR Acknowledgement/Curtailment Archival
Acrobat 91 KB 8/14/12 350 Increase the initial limit for NNl relief provided during TLR issuance Version 2.0
Acrobat 167 KB 10/3/12 351 Update the Flowgate GLDF Display to Show PJM Historic Control Areas
Acrobat 176 KB 10/3/12 352 Various Enhancements to the NNL Re-Dispatch Worksheet
Acrobat 173 KB 10/3/12 353 PSEC-SOCO Dynamic Tags
Acrobat 94 KB 10/3/12 354 Sending IDC TLR ID to SPP via WebData Interface
Acrobat 173 KB 10/3/12 355 Make Informational Flowgates Selectable in Study TLR Mode
Acrobat 274 KB 11/7/12 356 TVA RC Requires all IPPs to be a Pseudo BA in the IDC
Acrobat 91 KB 11/19/12 357 Authorization for OATI Use of IDC Data for DOE Studies (2012)
Acrobat 189 KB 8/22/04 nn CO and Task Order Summary
Acrobat 49 KB 12/10/01 nn Separating DECO and CONS Tags in the MECS Control Area
Acrobat 24 KB 8/23/02 nn IDC TLR Data Request for Entergy
Acrobat 1,335 KB 12/31/01 nn Modeling of Jointly Owned Units for Participation in TDF Calculations
Acrobat 1,327 KB 3/15/04 nn Modeling of Partial Control of Phase Angle Regulated Interfaces
Acrobat 24 KB 5/1/02 nn Data Connection Between IDC and SDX
Acrobat 23 KB 8/14/02 nn TDF and GSF Files from Base Model
Acrobat 24 KB 1/17/02 nn WSCC and ERCOT Tag Identification in the TLR Congestion Management Report