Interconnection
Integration of Variable Generation Task Force (IVGTF)

Interconnection l Operation l Planning l Probabilistic Techniques l Reference Manual
Interconnection Related Files
References Size Date Task Force 1-3 - Interconnection Requirements Enhanced
Acrobat 2,512 KB 3/2/2012  Draft Special Reliability Assesment: Interconnection Requirements for Variable Generation
Acrobat 51 KB 9/1/2010 Group Roster
Acrobat 46 KB 7/22/2010 ERCOT Wind Plant Requirements
Acrobat 347 KB 5/14/2010 Spain Grid Code - English
Acrobat 245 KB 4/29/2010 CAISO Interconnection Standards Review Initiative - Draft Straw Proposal
Acrobat 150 KB 4/29/2010 Summary of ANSI IEEE C50.13
Acrobat 23.2 KB 4/29/2010 Summary of IEC 61400-1
Zipped 2,090 KB 4/6/2010 IESO Market Rules, AESO Wind Power Facility, Hydro Quebec Transmission Provider Technical Requirements
Acrobat 484 KB 4/6/2010 German EON Grid Code
Acrobat 1,353 KB 4/6/2010 Irish Grid Code
Acrobat 1,182 KB 4/6/2010 UK Guidance Notes for Power Park Developers Sept 25 Issue
Acrobat 2,979 KB 4/6/2010 UK Grid Code
Acrobat 867 KB 4/6/2010 British Columbia Interconnection Requirements
Acrobat 1,058 KB 4/6/2010 Mexico (Spanish) Interconnection Requirements
Acrobat 883 KB 4/6/2010 Monitoba Hydro Interconnection Requirements
Acrobat 51 KB 3/31/2010 FERC 661 Order
Acrobat 14 KB 3/31/2010 VAR - 001
Acrobat 14 KB 3/31/2010 VAR - 002
Acrobat 14 KB 3/31/2010 MOD 026
Acrobat 14 KB 3/31/2010 NERC FAC-001-0
Acrobat 14 KB 3/31/2010 NERC COM-002
Acrobat 133 KB 3/31/2010 NERC PRC-024
Acrobat 14 KB 3/31/2010 NERC PRC-006
Acrobat 246 KB 3/30/2010 Draft CAISO Interconnection Standards
Acrobat 431 KB 3/30/2010 AESO Rules Comparison Document
Acrobat 17 KB 3/30/2010 Meeting Minutes for March 30
Acrobat 21 KB 3/30/2010 Meeting Minutes for February 19
Acrobat 18 KB 3/30/2010 Report Outline
Acrobat 15 KB 3/30/2010 Work Plan
Acrobat 1,828 KB 2/3/2010 GE Technical Requirements for Wind Generation Interconnection and Integration
Acrobat 62 KB 11/8/2009 IVGTF 1-3 Interconnection Requirements Enhancement Task Objectives and Work Plan
Acrobat 132 KB 7/27/2009 IVGTF 1-3, 1-7, 2-2 Meeting Notes - July 27, 2009
References Size Date Task Force 1-7 - Low Voltage Ride-through Requirements
Acrobat 97 KB 1/5/2009 IVGTF 1-7 Low Voltage Ride-Through Requirements Work Plan Approach
Acrobat 132 KB 7/27/2009 IVGTF 1-3, 1-7, 2-2 Meeting Notes - July 27, 2009
References Size Date Task Force 2-2 - BA Communications
Word 3,797 KB 9/28/2012 NERC IVGTF Task 2.2 Report - DRAFT (Word Version)
Word 3,790 KB 6/5/2012 NERC IVGTF Task 2.2 Report - DRAFT (Word Version)
Acrobat 964 KB 8/3/2011 Hydro Quebec’s Interconnection Requirements
Acrobat 96 KB 7/20/2011 IVGTF 2-2 Conference Call Meeting Minutes - July 20, 2011
Excel 37 KB 9/10/2009 Task Force 2-2: Standard's List
Acrobat 73 KB 8/31/2009 IVGTF 2-2 Conference Call Minutes - August 31, 2009
Acrobat 132 KB 7/27/2009 IVGTF 1-3, 1-7, 2-2 Meeting Notes - July 27, 2009