search
  |    Account Log-In/Register    |    Contact Us
System Protection and Control Subcommittee (SPCS) Related Files
 
 

 Related Files

 
  
  
Description
FERC Order 754 Final Report - SPCS-SAMS.pdf10/20/2015
FERC Order No. 754 - Assessment of Protection System Single Points of Failure Based n the Section 1600 Data Request
NERC - SPCS UAT - FEB_2016_final.pdf7/7/2016
Unit Auxiliary Transformer Overcurrent Relay Loadability During a Transmission Depressed Voltage Condition
SAMS-SPCS_Order 758 Autoreclosing Report_Final.pdf7/21/2014
Considerations for Maintenance and Testing of Autoreclosing Schemes - System Analysis and Modeling Subcommittee & System Protection and Control Subcommittee
SAMS-SPCS_SPS_Technical_Reference_Final_Rev0_1.pdf1/22/2014
Special Protection Systems (SPS) and Remedial Action Schemes (RAS):
Assessment of Definition, Regional Practices, and Application of Related Standards
SPCS _Scope_20170622.pdf6/22/2017
SPCS Scope
SPCS Commissioning Testing Response_Final.pdf5/20/2013
SPCS Commissioning Testing Response_Final
SPCS Gen Prot Coordination Technical Reference Document.pdf7/30/2015
Considerations for Power Plant and Transmission System Protection Technical Reference Document – Revision 2
SPCS Power Swing Report_Final_20131015.pdf10/15/2013
Protection System Response to Power Swings
SPCS_Order 758 Sudden Pressure Report_Final.pdf9/6/2013
Sudden Pressure Relay and Other Devices that Respond to Non-Electrical Quantities - SPCS Input for Standard Development in Response to FERC Order No. 758
 

home | account log-in/register | legal and privacy/trademark policy | site map | careers | contact us

Atlanta Office | 3353 Peachtree Road, NE Suite 600 North Tower, Atlanta, GA 30326 | 404-446-2560
Washington Office | 1325 G Street, NW Suite 600, Washington, DC 20005| 202-400-3000

Copyright 2016 North American Electric Reliability Corporation. All rights reserved.