Project 2007-17 Protection System Maintenance and Testing
Related Files

Status:
FERC issued an order approving PRC-005-2 on December 19, 2013.  The order will be effective on February 24, 2014.  The implementation plan for PRC-005-2 includes specific compliance dates and timeframes for each of the Requirements.  For purposes of calculating the time periods in the implementation plan, the regulatory approval date in the U.S. is February 24, 2014.

In addition, FERC directed a change to the Violation Severity Levels for Requirement R1.  These changes are posted for review by the NERC Board, and will be filed with applicable regulatory authorities once the Board has approved them.

Purpose/Industry Need: 
The purpose of standard PRC-005 should remain “To ensure all transmission and generation Protection Systems affecting the reliability of the Bulk Electric System (BES) are maintained and tested.”

In Order 693, the Federal Energy Regulatory Commission directed that changes be made to these standards.

These standards should be consolidated into a single standard to reduce the costs of compliance and a number of technical short comings in these standards should be corrected to provide reliable performance when responding to abnormal system conditions.


Draft Action Dates Results Consideration of Comments

Revised VSLs for PRC-005-2

Clean | Redline to last approved

For Board Review 4/7/2014

Standard PRC-005-2

Clean | Redline

 

Implementation Plan

Clean | Redline

Errata Change: The Standards Committee approved an errata change to the implementation plan for PRC-005-2 to add the phrase “or as otherwise made effective pursuant to the laws applicable to such ERO governmental authorities;” to the second sentence under the “Retirement of Existing Standards” section.  ​

 

 

Errata Filed: 10/30/13​

Draft 4
 
Standard PRC-005-2
 
Implementation Plan
 
Supporting Materials:
 
Supplemental Reference & FAQ
 
Technical Justification
 
Mapping Document
 
VRF and VSL Justification
 
Last Approved Versions of Standards to be Retired:

 

 

 

 

 

 

 

 

 

Recirculation Ballot

Info>>

Vote>>

 

 

 

 

 

 

 

 

 

10/15/2012 - 10/24/2012
(closed)

 

 

 

 

 

 

 

 

 

Summary>>

Ballot Results>>

 
Draft 4
 
Standard PRC-005-2
 
Implementation Plan
 
Supporting Materials:
 
(Updated 8/16/12)
 
Supplemental Reference & FAQ
 
Technical Justification
 
Mapping Document Clean | Redline to Last Posting
 
 
VRF and VSL Justification
 
Last Approved Versions of Standards to be Retired:
 
 

 

 

 

Successive Ballot

Updated Info>>

Info>>

Vote>>

 

 

 

 

 

8/17/2012 - 8/27/2012
(closed)

 

 

 

 

 

Summary>>

Ballot Results>>

   

 

 

 

 

Comment Period

Info>>

 

 

 

 

 

7/27/2012 - 8/27/2012
(closed)

 

 

 

 

 

Comments Received>>

 

 

 

 

 

Consideration of Comments>>

Draft 3 Standard PRC-005-2
 
Implementation Plan
 
Supporting Materials:
 
 
For Information:
 
Supplemental Reference & FAQ
 
Technical Justification
 
Mapping Document
 
 
VRF and VSL Justification
 
 
Last Approved Versions of Standards to be Retired:
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Successive Ballot
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
6/18/2012 - 6/27/2012
(closed)

 

 

 

 

 

 

 

 

Summary>>

Ballot Results>>

Non-binding Poll Results>>

 
Formal Comment Period

Info>>

 
5/29/2012 - 6/27/2012
(closed)

 

Comments Received>>

 

Consideration of Comments>>

Draft 2

Standard PRC-005-2
Clean | Redline to Last Posting

Implementation Plan
Clean | Redline to Last Posting

SAR
Clean | Redline to Last Posting

Supporting Materials:
Definition of Protection System

Supplemental Reference & FAQ
Clean | Redline to Last Posting

Technical Justification

Mapping Document

Table of Issues and Directives

VRF and VSL Justification

Unofficial Comment Form

Last Approved Versions of Standards to be Retired:
PRC-005-1
PRC-008-0
PRC-011-0
PRC-017-0
 
 
 
 
 
 
 
Successive Ballot and Non-binding Poll
 

 

 

 

 

 

3/19/2012 - 3/28/2012
(closed)

            

 

 

 

 

Full Record>>

Non-binding Poll Results>>

 
 
 
Formal Comment Period 
 

 

 

 

2/28/2012 - 3/28/2012
(closed)

 

 

 

Comments Received>>

 

 

 

Consideration of Comments>>

Drafting Team Nominations
Nomination Period
 

 9/1/2011 - 9/23/2011
(closed)
   
Standard PRC-005-2
Clean | Redline to Recirc Ballot

Implementation Plan
Clean | Redline to Recirc Ballot

SAR

Supporting Materials:
Definition of Protection System

Supplemental Reference & FAQ
Clean | Redline to Last Posting

Mapping  Document

Unofficial Comment Form

Last Approved Versions of Standards to be Retired
PRC-005-1
PRC-008-0
PRC-011-0
PRC-017-0

Initial Ballot and Non-Binding Poll of VRFs and VSLs
 
 
9/19/2011 - 9/29/2011
(closed)

 

Summary>>

Full Record>>

 

 

 

 

 

 

 

Consideration of Comments>>

Non-Binding Poll Results>>
Formal Comment Period
8/15/2011 - 9/29/2011
(closed)

 

Comments Received>>

 
(Initial Ballot and Non-Binding Poll)
 
 
8/15/2011 - 9/14/2011
(closed)
 
 
 
After PRC-005-2 failed to reach ballot pool approval in the recirculation ballot that ended on 6/30/11, the drafting team revised the standard. The Standards Committee authorized re-initiating the project with a posting of the SAR and revised standard for a 45-day comment period, with an initial ballot of the standard conducted during the last 10 days of the comment period.
Standard Draft 4

PRC-005-2
Clean | Redline to Last Posting

Implementation Plan for Standard
Clean | Redline to Last Posting

Supporting Materials:
Definition for Approval

Supplemental Reference & FAQ
Clean | Redline to Last Posting

Last Approved Versions of Standards to be Retired
PRC-005-1 PRC-008-0 PRC-011-0 PRC-017-0
 
 
 
 
 
 
Recirculation Ballot and Non-binding Poll
 
 
 
 
 
 
 
 
 
6/20/2011 - 6/30/2011
(closed)

 

 

 

 

Summary>>

Full Record>>

Non-Binding Poll Results>>

 
Standard Draft 4

PRC-005-2
Clean | Redline to Last Posting

Implementation Plan for Standard
Clean | Redline to Last Posting

Supporting Materials:
Comment Form (Word)

Supplemental Reference & FAQ
Clean
Successive Ballot and Non-Binding Poll
 
5/3/2011 - 5/13/2011
(closed)
Summary Update>>

    Full Records Update>>

Non-Binding Poll Results>>

 

 

 

 

Consideration of Comments>>

Comment Period
 
4/13/2011 - 5/13/2011
(closed)
Comments Received>>

Standard Draft 3

PRC-005-2
Clean | Redline to Last Posting

Implementation Plan for Standard
Clean | Redline to Last Posting

Supporting Materials Comment Form (Word)  

Frequently Asked Questions
Clean | Redline to Last Posting  

Supplemental Reference
Clean | Redline to Last Posting  

Last Approved Versions of Standards to be Retired
PRC-005-1 PRC-008-0 PRC-011-0 PRC-017-0

 

 

 

Successive Ballot and Non-binding Poll of VRFs and VSLs

Updated Info>> Info>> Join>>

12/10/2010- 12/20/2010
(closed)

Successive Ballot
(closed)

Non-binding Poll of VRFs and VSLs
(closed)
Summary>>

Full Records>>

 

 

Consideration of Comments>>

Non-Binding Poll Results>> Consideration of Comments>>

 

 

Comment Period 

Info>>  

 

 

 

11/17/2010 - 12/17/2010
(closed)

 

 

 

Comments Received>>

 

 

Consideration of Comments>>

Draft 5

Definition of "Protection System"
Clean | Redline to last approval

Implementation Plan for Definition
Clean | Redline to last posting

 

Recirculation Ballot >>

Vote >>

Info >>  

 

11/1/2010 - 11/11/2010 (closed)

 

Summary>> Full Record>>

 
Draft 4  

Definition of "Protection System"
Clean | Redline to Second Ballot Redline to Last Approval  

Implementation Plan for Definition
Clean  

Supporting Materials:
Comment Form (Word)  
Successive Ballot >>

Vote>>

Info>>
10/2/2010 - 10/14/2010 (closed) Summary>> Full Record>> Consideration of Comments>>
30-day Formal Comment Period

Info>>

9/13/2010 - 10/12/2010 (closed) Comments Received>> Consideration of Comments>>
Draft 3

Definition of "Protection System"
Clean | Redline to Initial Ballot    

Implementation Plan for Definition
Clean | Redline to Initial Ballot
Second Ballot for Definition  

Vote>> | Info>>
7/23/2010 - 8/02/2010
(closed)
Summary>>

Full Record>> 
Consideration of Comments (definition)>>
 
Draft 2

PRC-005-2
Clean | Redline to Last Posting

Implementation Plan for Standard
Clean | Redline to Last Posting

Implementation Plan for Definition

Supporting Materials:
Comment Form for Proposed Definition (Word)

Comment Form for Standard (Word)

Frequently Asked Questions
Clean | Redline to Last Posting

Supplemental Reference
Clean | Redline to Last Posting

Definition of "Protection System"

Proposed Version of Issues Database
Initial Ballots and Non-binding VRF/VSL Poll

Vote>> | Info>>
7/08/2010 - 7/17/2010
(closed)
Summary>>

Full Record>>
Standard


Full Record>>
Definition


Non-binding Poll Results>>
Consideration of Comments (standard) >> Consideration
of Comments
   (definition) >> Consideration of Comments (non-binding poll) >>
Pre-ballot Review
Join>> | Info>>
6/11/2010 - 7/02/2010
(closed)
   
Comment Period

Info>>
6/11/2010 - 7/16/2010
(closed)

Consideration
of Comments
   (definition) >>
Consideration of Comments >>
Draft 1

Protection System Maintenance and Testing Standard
PRC-005-2

Supporting Materials:
Comment Form (Word)

Implementation Plan

Supplementary Reference

Status of Addressing Issues

Frequently Asked Questions

Assessment of Impact of Proposed Modification to the Definition of “Protection System”
Comment Period

Info>>


7/24/2009 - 9/08/2009
(closed)

Consideration of Comments>>
 

 

 Standard Drafting Team Nominations
Info>>

Submit Nomination>>
8/15/2007 - 8/29/2007 (closed)  
 
  Draft SAR Version 1

 

Protection System Maintenance and Testing Draft SAR Version 1
 
Supporting Materials :

 

 

Comment Period

Info>>

Submit Comments>>

6/11/2007 - 7/10/2007 (closed) Comments Received>> Consideration of Comments>>