| | 9/18/2025 | 2025 | |
| | 9/18/2025 | 2025 | |
| | 9/18/2025 | 2025 | |
| Supply Chain Risk Management Reliability Standards Revisions
FERC issues an order directing NERC to to develop Reliability Standards that address the sufficiency of responsible entities’ supply chain risk management plans, as well as to develop modifications related to supply chain protections for protected cyber assets. This final rule also terminates a related notice of inquiry.
| 9/18/2025 | 2025 | |
| Order Directing Report
FERC issues an order directing NERC to submit a report in an informational filing on best practices to reduce the risk of wildfire ignition fron the Bulk-Power System. The filing is due by May 1, 2026.
| 9/10/2025 | 2025 | |
| Order No. 907-A Order on Clarification (INSM)
FERC issues Order No. 907-A, an Order on Clarification for the CIP-015-1 (INSM) approval order. FERC clarified the scope of the term "CIP-networked environment" in response to Requests for Clarification from NERC and the American Public Power Association, Edison Electric Institute, and the National Rural Electric Cooperative Association (Trade Associations). FERC also declined to direct a joint FERC and NERC technical conference in response to a request from the Trade Associations.
| 8/21/2025 | 2025 | |
| Letter Order Approving Compliance Filing FERC issues a Delegated Letter Order accepting the June 16, 2025 Compliance filing submitted in response to FERC's Order Approving the 2024 Five-Year Performance Assessement.
| 8/11/2025 | 2025 | |
| Order Approving IBR Ride-through Standards
FERC issues Order No. 909 approving proposed Reliability Standards PRC-024-4, PRC-029-1, and the definition of the term Ride-through. FERC directs NERC, within 12 months of the effective date of the order, to determine whether, and if so how, to account for (1) the equipment limitations of HVDC-connected IBRs with choppers and (2) the long-lead time between adopting IBR design specifications and placing the IBR in-service. Additionally, the order directs NERC to submit an informational filing 18 months after the conclusion of the exemption request period in proposed Reliability Standard PRC-029-1, Requirement R4 that assesses the reliability impact of the exemptions to the standard. Finally, the order directs NERC to modify PRC-029-1 to clarify acceptable types of evidence for legacy hardware equipment that prevent IBR from meeting the ride-through requirements in PRC-029-1.
| 7/24/2025 | 2025 | |
| | 7/21/2025 | 2025 | |
| | 6/26/2025 | 2025 | |
| | 6/26/2025 | 2025 | |
| | 5/20/2025 | 2025 | |
| | 4/23/2025 | 2025 | |
| Notice Granting Extension of Time
FERC issues a letter order granting NERC's request for additional time for filing the Petition for Approval of EOP-012-3 from March 27, 2025 to April 14, 2025.
| 3/26/2025 | 2025 | |
| | 2/26/2025 | 2025 | |
| | 2/20/2025 | 2025 | RD25-1-000; RD25-2-000; RD25-3-000
|
| | 2/20/2025 | 2025 | |