Project 2007-06.2 Phase 2 of System Protection Coordination

Related Files | 2007-06 System Protection Coordination

Status
Final ballots for PER-006-1 – Specific Training for Personnel and the modified definitions of “Operational Planning Analysis” (OPA) and “Real-time Assessment” (RTA) concluded 8 p.m. Eastern, Thursday, May 26, 2016. The voting results for the standard and definitions can be accessed via the links below. The standard and definitions will be submitted to the Board of Trustees for adoption and then filed with the appropriate regulatory authorities.

Retirement of PRC-001-1.1(ii)
In conjunction with Project 2007-06 System Protection Coordination (Phase 1), NERC is proposing the complete retirement of PRC-001-1.1(ii). Requirements R1, R2, R5, and R6 are proposed for retirement in Project 2007-6.2 Phase 2 of System Protection Coordination. See the Mapping Document below for an explanation of how the reliability objectives of those requirements are addressed by other standards, the proposed PER-006-1 (Specific Training for Personnel), and the definition modifications to “Operational Planning Analysis” (OPA) and “Real-time Assessment” (RTA). The remaining two Requirements R3 and R4 of PRC-001-1.1(ii) are addressed by PRC-027-1 (Coordination of Protection Systems for Performance During Faults). For details for Phase 1 are found on the 2007-06 project page. The complete retirement of PRC-001-1.1(ii) is contingent upon the approval of Reliability Standards PRC-027-1 and the proposed PER-006-1 and definition modifications under Phase 2. NERC is proposing the retirement of PRC-001-1.1(ii) in the implementation plans associated with both projects.

Background
Phase 1 (2007-06)
The System Protection Coordination Standard Drafting Team developed a new Reliability Standard, PRC-027-1 to address coordination of Protection System performance during Faults. This standard incorporates and clarifies the Protection System coordination aspects of Requirements R3 and R4 contained in PRC-001-1.1 that is proposed for complete retirement.

Phase 2 (2007-06.2)
Phase 2 is addressing the remaining Requirements R1, R2, R5, and R6 of PRC-001-1.1(ii). See the Mapping Document for a complete explanation on how the reliability objectives of Requirements R1, R2, R5, and R6 are addressed by other standards, the modified definitions of OPA and RTA, and the proposed PER-006-1 Reliability Standard.

Standard(s) Affected:
 PER-006-1 - Specific Training for Personnel, Retirement of PRC-001-1.1 (ii) - System Protection Coordination

Purpose/Industry Need
Protection System coordination among registered owners of the Protection Systems associated with Interconnected Elements is key to the reliability of the Bulk Electric System.  
​Draft ​Actions ​Dates Results ​Consideration of Comments
 
Final Draft

PER-006-1
Clean | Redline to Last Posted

PRC-001-1.1 (ii)
Redline to Last Approved

Definitions of “Operational Planning Analysis” and “Real-time Assessment”
Clean | Redline to Last Posted
Implementation Plan
 
Supporting Materials
 
Mapping Document
 
 
Evaluation of Definition Impacts to Reliability Standards
  
 
​Final Ballots

Info

Vote
​05/17/16 - 05/26/16 Summary

Ballot Results

Standard

Definitions
Draft 1

PER-006-1
 
PRC-001-1.1 (ii)
Redline to Last Approved
 
Definitions
 
 
 
 

Initial Ballots and Non-binding Poll

Updated Info

Info

Vote

​04/15/16 - 04/25/16

Summary

Ballot Results

Standard

Definitions

Non-binding Poll Results​


Comment Period

Info

Submit Comments

03/10/16 - 04/25/16​​ Comments Received​ Consideration of Comments​

Join Ballot Pools


If you had previously joined the ballot pools for this project, you must join these new ballot pools to cast votes. Ballot pool members from previous ballots for
2007-06.2 will not be carried over to these ballot pools.


​03/10/16 - 04/08/16
Info

Send RSAW feedback to:
03/24/16 - 04/25/16​​
Standard Drafting Team Nominations
 
Supporting Materials
 

Nomination Period​

Info


01/​26/16 - 02/09/16​
 
 
Draft 2
 
 
TOP-009-1
 
Implementation Plan
 
Supporting Materials
 
 
Mapping Document
Clean | Redline to Last Posted
 
VRF/VSL Justification
Clean | Redline to Last Posted
 
 
 
 
 

Additional Ballot and Non-binding
Poll

Updated Info

Info

Vote
​11/10/15 - 11/19/15 Summary

Ballot Results

Non-binding Poll Results

Comment Period

Info

Submit Comments
​10/06/15 - 11/19/15 Comments Received​ Consideration of Comments​

Info

Send RSAW feedback to:

RSAWfeedback@nerc.net
10/20/15 - 11/19/15​
 Draft 1
 
 
 
 


Initial Ballot and Non-binding Poll

Updated Info

Info

Vote

09/02/15 - 09/11/15

Summary

​Ballot Results

Non-binding Poll Results


Comment Period

Info

Submit Comments

​07/29/15 - 09/11/15 Comments Received Consideration of Comments​

​Join Ballot Pools

​07/29/15 - 08/27/15

Info

Send RSAW feedback to:

RSAWfeedback@nerc.net
 ​
08/12/15 - 09/11/15​
Nominations for Standard Drafting Team
 
Supporting Materials
 
 
Nomination Period
 
 ​
 
 
01/06/15 - 01/20/15
 
Project 2007-06 System Protection Coordination (Phase 1) Reference Material
 
 

Final Standard Authorization Request (SAR)
Clean | Redline

  
Draft SAR Version 1
System Protection Coordination
Draft SAR Version 1

Supporting Materials

NERC SPCTF Assessment of Standard PRC-001-0 – System Protection Coordination
Comment Period 

Info

Submit Comments
6/11/2007 - 7/10/2007 Comments Received Consideration of Comments
 

 Voting