White Paper
|
|
|
|
|
applicable to GOs/GOPs
*Appendix B – NERC standards
recommended for consideration to clarify
applicability for dispersed generation
|
Comment Period
|
06/12/15 - 07/13/15 |
Comments Received |
Consideration of Comments |
*Appendix A and Appendix B are reflected in separate tabs in a single Excel document, which is duplicated and posted for reference under individual links, one for Appendix A, and one for Appendix B. |
Errata Change:
On November 13, 2014, the NERC Board of Trustees (Board) adopted PRC‐006‐2, PRC 004‐2.1(i)a, PRC‐004‐4, PRC‐005‐2(i), and PRC‐005‐3(i). Each of these standards, or its associated documents, contain inadvertent errors that needed to be corrected prior to filing with applicable regulatory authorities. The standards referenced the implementation plan in the Effective Date section. As a result, there are no associated changes to the standard with the corrections.
Each error and how the corrections meet the required elements of an errata change are described below.
· References to “(X)” in Implementation Plans for PRC‐004‐2(i)a, PRC‐005‐2(i), and PRC‐005‐3(i) needed to be changed to align the standard versions with the updated NERC standards numbering convention.
· The Effective Date language in the Implementation Plan for PRC‐004‐4 needed to be corrected to properly sequence version 4 to become effective concurrently with or after version 3. The implementation plan provided for an immediate effective date, which in some scenarios could make version 4 effective prior to version 3, which has a 12 month period after approval before it becomes effective. The drafting team intended to sequence the standards to ensure that version 4 did not go into effect prior to version 3, but went into effect immediately upon approval if version 3 was effective.
A correction was also needed to ensure version 4 becomes effective on the later of the effective date of PRC‐004‐3 or the date that PRC‐004‐4 is approved by an applicable governmental authority. A conforming correction to reference the effective date of PRC‐004‐3 rather than “12 months following the approval of PRC-004‐3” to make sure that the implementation timing for PRC‐004‐3 is properly cross referenced was also needed.
Implementation Plans
PRC-004-4
|
Project 2014-01 did not conduct non-binding polls for VRF/VSLs because the project was limited to applicability changes to the requirements that neither impacted, nor necessitated revision to, any of the VRFs and VSLs associated with the project. |
Final Draft
Implementation Plan
Supporting Documents
|
Final Ballot
Vote>> |
03/02/15 – 03/11/15 |
Summary>>
Ballot Results>> |
|
Final Drafts
PRC-001-1.1(ii)
PRC-019-2
PRC-024-2
Implementation Plans
|
Final Ballots
Vote>>
(Closed)
|
01/13/15 - 01/22/15 |
Summary>>
Ballot Results
PRC-001-1.1(ii)>>
PRC-019-2>>
PRC-024-2>> |
|
applicable to GOs/GOPs
recommended for consideration to clarify
applicability for dispersed generation
|
Comment Period
(Closed) |
12/22/14 - 01/20/15 |
Comments Received>> |
|
Draft 1
Supporting Documents
|
Initial Ballot
(Closed)
|
1/12/15 – 1/22/15 |
Summary>>
Ballot Results>> |
Consideration of Comments>> |
Comment Period
(Closed)
|
12/8/14 – 1/22/15 |
Comments Received>> |
Join Ballot Pool
(Closed) |
12/8/14 – 1/8/15 |
|
Draft 1 Standards
PRC-001-1.1(X)
PRC-019-2
PRC-024-1(X)
Implementation Plans
Supporting Documents
|
|
12/10/14 – 12/23/14 |
Summary>>
Ballot Results
PRC-001-1.1(X)
PRC-019-2
PRC-024-1(X)
|
Consideration of Comments>>
|
Comment Period
Info>>
(Closed)
The ballots and comment period have heen extended one additional day to 8 p.m. Eastern on Tuesday, December 23, 2014 in order to reach quorum |
11/5/14 – 12/23/14 |
Comments Received>> |
Join Ballot Pools
Info>>
Join>>
(Closed)
|
11/5/14 – 12/4/14 |
|
The comment period and initial ballot close dates have been extended one day to December 22, 2014 (for the medium-priority Reliability Standards) due to a NERC.com maintenance outage that occurred on Saturday, December 13, 2014. |
Final Drafts
PRC-004-2.1(i)a
PRC-004-4
VAR-002-4
Implementation Plans
PRC-004-2.1(i)a
Clean (No changes to last posted)
PRC-004-4
Clean (No changes to last posted)
VAR-002-4Clean
(No changes to last posted)
|
Final Ballots
Vote>>
(Closed) |
10/28/14 – 11/06/14 |
Summary>>
Ballot Results
PRC-004-2.1(i)a>>
PRC-004-4>>
VAR-002-4>> |
|
Draft 2 Standard
PRC-004-2.1a(X)
PRC-004-4
Implementation Plans
Supporting Documents
|
Additional Ballots
Updated Info>>
Info>>
Vote>>
(Closed) |
10/10/14 - 10/22/14 |
Summary>>
Ballot Results
PRC-004-2.1a(X)>>
PRC-004-4>> |
Consideration of Comments
PRC-004>>
VAR-002-4>> |
(Closed) |
9/5/14 - 10/22/14 |
Comments Received>> |
Draft 2
PRC-005-2(X)
PRC-005-3(X)
Implementation Plans
Supporting Documents
SAR |
Final Ballots
Vote>>
(Closed) |
8/27/14 – 9/5/14 |
Summary>>
Ballot Results
PRC-005-2(X)>>
PRC-005-3(X)>> |
|
Draft 2
VAR-002-2b(X)
VAR-002-4
Implementation Plan
Supporting Documents
SAR |
Additional Ballots
Vote>>
(Closed) |
10/7/14 – 10/16/14 |
Summary>>
Ballot Results
VAR-002-4>>
VAR-002-2b(X)>> |
|
Comment Period
(Closed) |
8/27/14 – 10/16/14 |
Comments Received>> |
Draft 1 Standard
PRC-004-2.1a(X)
PRC-004-3(X)
Implementation Plans
Supporting Documents
Draft Reliability Standard Audit Worksheets (RSAW)
|
(Closed)
|
8/15/14 – 8/26/14 |
Summary>>
Ballot Results
PRC-004-2.1a(X)>>
PRC-004-3(X)>> |
|
Comment Period
(Closed)
|
7/10/14 – 8/26/14 |
Comments Received>> |
Consideration of Comments>> |
Join Ballot Pools>>
(Closed)
Please note: As a convenience to stakeholders, if you have previously joined the ballot pool for VAR-002-2b(X), no action is needed - you have automatically been entered into both the PRC-004-2.1a(X) and PRC-004-3(X) ballot pools. If you have been automatically entered and do not wish to participate, please contact Wendy Muller prior to July 16, 2014 to have your name removed. |
7/10/14 - 7/16/14 |
|
|
Draft 1 Standards
PRC-005-2(X)
PRC-005-3(X)
PRC-005-X(X)
VAR-002-2b(X)
VAR-002-4
Implementation Plans
Supporting Documents
Draft Reliability Standard Audit Worksheets (RSAW)
|
Initial Ballots
Info>>
Vote>>
(Closed) |
7/18/14 – 7/29/14 |
Summary>>
Ballot Results:
PRC-005-2(X)>>
PRC-005-3(X)>>
PRC-005-X(X)>>
VAR-002-2b(X)>>
VAR-002-4>> |
|
Formal Comment Period
(Closed)
|
6/12/14 – 7/29/14 |
Comments Received>> |
Consideration of Comments>> |
Join Ballot Pool
Join>>
(Closed)
Please note: these ballot pool join periods have been extended to 8 p.m. Eastern on Wednesday, July 16, 2014 in order to keep the closing dates for Project 2014-01 the same. |
6/12/14 – 7/16/14 |
|
|
|
Informal Comment Period
|
04/17/14 - 05/05/14 |
Comments Received>> |
Consideration of Comments>> |
SAR
Supporting Documents:
Unofficial Comment Form (Word) |
Comment Period
| re
| | |