Project 2021-04 Modifications to PRC-002 - Phase II

​​​​​​​​​​​​​​​​​​​​​​​​​​​Related Files​

Status
A formal comment period for PRC-028-1 - Disturbance Monitoring and Reporting Requirements for Inverter-based Resources is open through 8 p.m. Eastern, Monday, August 12, 2024. 

This will be the last opportunity for NERC to ballot these projects through traditional mechanisms. The Board may take requisite action during the August 2024 Board of Trustees meeting to ensure directives are met.  

The Standards Committee approved waivers to the Standard Processes Manual at their December 2023 meeting. These waivers were sought by NERC Standards staff for reduced formal comment and ballot periods. This will assist the drafting teams in expediting the standards development process due to firm timeline expectations set by FERC Order 901. FERC Order 901 was issued under Docket No. RM22-12-000 on October 19, 2023. 

To assist industry in this upcoming comment and ballot period, NERC has released a Milestone 2 Summary that provides high-level overview of the current state of the associated projects and their interrelationships. The drafting team's considerations of the responses received from the previous comment period are reflected in this draft of the standard. 

Note: PRC-002-5 passed the recent additional ballot (conducted June 5-15, 2024). The drafting team will be moving this standard to a final ballot when the PRC-028-1 ballots open (August 2-12, 2024) as only non-substantive revision(s) were made.


​​​​​Background
This project will be completed in two phases. The first phase addressed the scope regarding notifications relative to the sequence of events recording (SER) and fault recording (FR) data, and to clearly identify the BES Element owners that need to have SER and FR data for transformers and transmission lines with the associated identified bus in the Glencoe Light and Power SAR.

The second phase will address gaps the Inverter-Based Resource Performance Task Force (IRPTF) identified within the PRC-002. The goal is to modify the requirements to ensure adequate data is available and periodically assessed to facilitate the analysis of BES disturbances, including in areas of the Bulk Power System (BPS) that may not be covered by the existing requirements.


Standard(s) Affected PRC-002-3 Disturbance Monitoring and Reporting Requirements

Purpose/Industry Need
The purpose of PRC-002 is to have adequate data available to facilitate analysis of BES disturbances.  Requirements R1 and R5 specify where SER and FR data, and where dynamic Disturbance recording (DDR) data, respectively, are required in the Bulk Electric System (BES).

With the changing resource mix and increasing penetration of IBRs, PRC-002-2 does not serve its intended purpose adequately. To the extent that the standard is already requiring monitoring devices and periodic assessments, the location requirements and associated periodic assessments need to be revised. These revisions are necessary so that required data is available for the purposes of post-mortem event analysis and identifying root causes of large system disturbances.


Subscribe to this project's observer mailing list
Select "NERC Email Distribution Lists" from the "Service" drop-down menu and specify “Project 2021-04 Modifications to PRC-002" in the Description Box. ​


DraftActionsDatesResultsConsideration of Comments
Draft 3
The drafting team decided to remove “4.1.1. Transmission Owner that owns equipment as identified in section 4.2” from the Applicability and all of the Transmission Owner referenced in the Requirements of Standard PRC-028-1
​​

PRC-028-1 *Updated
 Clean | Redline to Last Posted​

Implementation Plan *Updated
Clean | Redline to Last Posted

 
Supporting Materials
Unofficial Comment Form (Word)​

PRC-028​-1 VRF/VSL Justifications*Updated​ 
Cle​an | Redline to Last Posted​

PRC-028-1 Technical Rationale *Updated
Clean​ | Redline to Last Posted​

Consideration of FERC Order 901 Directives


Additional Ballots and Non-binding Polls

Updated Info

Info

Vote




08/02
/24 – 08/12/24


Comment Period

Updated Info
Info

Submit Comments




​07/22
/24 – 08/12/24
Draft 3

PRC-002-5
Clean | Redline to Last Posted | Redline to Last Approved

PRC-028-1
 Clean | Redline to Last Posted

Implementation Plan
Clean | Redline to Last Posted

 

Supporting Materials

Unofficial Comment Form (Word)

VRF/VSL Justification
PRC-002-5
Clean | Redline to Last Posted

PRC-028-1
Clean | Redline to Last Posted

Technical Rationale
PRC-002-5
Clean | Redline to Last Posted

PRC-028-1
Clean​ | Redline to Last Posted​



Additional Ballots and Non-binding Polls

Updated Info​ (Ballot Reminder)

Updated Info​ (Extension)
Info

Vote






06/05/24 – 06/17/24​
(extended to reach quorum)​​
Ballot Results



Non-binding Poll Results​




Comment Period

Updated Info​ (Extension)

Info

Submit Comments







05/31/24 – 06/17/24
(extended)





Comments Received​




​Considerati​on of Comments​​

Draft 2

PRC-002-5
Clean | Redline to Last Posted | Redline to Last Approved

PRC-028-1
 Clean | Redline to Last Posted

Implementation Plan
Clean | Redline to Last Posted

 

Supporting Materials

Unofficial Comment Form (Word)

VRF/VSL Justification
PRC-002-5 (no change from last posting)

PRC-028-1
Clean | Redline to Last Posted

Technical Rationale
PRC-002-5 (no change from last posting)

PRC-028-1
Clean​ | Redline to Last Posted​





Additional Ballots and Non-binding Polls

Up​dated​ Info​​ (Ballot Reminder)​​​​​​

Info

Vote








04/02/24 – 04/11/24​

Ballot Results

PRC-002-5
PRC-028-1

Implementation Plan

Non-binding Poll Results
PRC-002-5
PRC-028-1​

















​​
​​

Consideration of Comments​
​​





Comment Period

Info

Submit Comments






03/18/2​​4 – 04/11/24​​





Comments Received​
​​
Waiver​​​​
​Standards Committee accepted the waiver on December 13, 2023. ​​

Draft 1

PRC-002-5
Clean | Redline​

PRC-028-1 

Implementation Plan 


Supporting Materials

Unofficial Comment Form (Word)

VRF/VSL Justification
PRC-002-5

PRC-028-1

Technical Rationale
PRC-002-5

PRC-028-1



Initial Ballots and Non-binding Polls

Up​dated Info​​ (Ballot Reminder)​​​​​​

Info

Vote




09/05/23 - 09/14/23​

​​Ballot Results

PRC-002-5
PRC-028-1​


Implementation Plan​

Non-binding Poll Results
PRC-002-5
PRC-028-1



Join Ballot Pools

​08/01/23 - 08/30/23







Comments Received​







​Consideration of Comments


Comment Period


I​nfo​

Submit Comments​​


08/01/23 - 09/14/23

Final Draft

PRC-002-4
Clean | Redline to Last Posted | Red​line to Last Approved​

(This posting only addresses Glencoe Light SAR)

Implementation Plan
Clean​ | Redline to Last Posted

 

Supporting Materials

VRF/VSL Justification​

Technical Rationale
Clean | Redline to Last Posted​


 

 

 

Final Ballot

Info

Vote

 

 

 

12/07/22 – 12/16/22​​



​​Ballot Results

PRC-002-4​

Implementation Plan​

Draft 2

PRC-002-4
Clean | Redline to Last Posted | Redline to Last Approved

(This posting only addresses Glencoe Light SAR)

Implementation Plan
Clean | Redline to Last Posted

 

Supporting Materials

Unofficial Comment Form – Glencoe Light (Word)​

VRF/VSL Justification
Clean | Redline to Last Posted

Technical Rationale
Clean | Redline to Last Posted


Additio​​​nal Ballots and
Non-binding Polls

Updated Info​ (Ballot Reminder)​​​​​

Info

Vote




10/31/22 - 11/14/22​​ (extended to reach quorum)


​​Ballot Results


PRC-002-4​

Implementation Plan

Non-binding Poll Results


​​Comment Period

Info​

Submit Comments​​



09/26/22 – 11/10/22​
(extended)


Comment Received
​​

Consideration of Comments​​



Draft 1

PRC-002-4
Clean | Redline

(This posting only addresses Glencoe Light SAR)

Implementation Plan

 ​​

Supporting Materials

Unofficial Comment Form – Glencoe Light (Word)

VRF/VSL Justification

Technical Rationale


Initial Ballots and 

Non-binding Polls

Info

Vote




07/15/22 – 07/25/22​

Ballot Results
Non-Binding Poll Results



Join Ballot Pools

06/09/22 – 07/08/22



​​​

Comment Period

Info​

Submit Comments


06/09/22 – 07/25/22


Comments Received

Consideration of Comments​​
SAR Glencoe Light
Clean | Redline

SAR IRPTF *updated
Cl​ean | Red​line​​

The Standards Committee accepted these SARs on January 19, 2022.
Drafting Team Nominations

Supporting Materials

Nomination Period

Info​​ (Updated)​




06/14/21 – 07/30/21 (Extended)

SAR Glencoe Light (Formal)

SAR IRPTF​ (In​formal)

Supporting Materials​​​

Unofficial Comment Form - Glencoe Light (Word) 

Unofficial Co​mment Form - IRPTF (Word) 

IRPTF Review of NERC Reliability Standards
White Paper​




Comment Period

Info ​(Updated)








06/14/21 – 07/13/21​





Consideration of Comments
Glencoe Light


Consideration of Comments
IRPTF​


​​

 

​